The selected contractor for landslide mitigation works in Package 008 Lot 1 (RLVMMP/WORKS/08LOT1), M/s RR Construction (Pvt). Ltd took over the sites on 16th March 2024.
The work consists of constructions such as soil nailing, retaining walls, horizontal drains, reshaping & turfing, and surface drains, as slope rectification measures.