Site Possession – Package 08 Lot 3

The selected contractor for landslide mitigation works in Package 008 Lot 3 (RLVMMP/WORKS/08LOT3), M/s ELS Construction (Pvt). Ltd. took over the sites on 18th March 2024.  The work consists of constructions …

Site Possession – Package 08 Lot 2

The selected contractor for landslide mitigation works in Package 008 Lot 2 (RLVMMP/WORKS/08LOT2), M/s Sanguine Sri Ram JV took over the sites on 17th March 2024.  The work consists of constructions …

Site Possession – Package 08 Lot 1

The selected contractor for landslide mitigation works in Package 008 Lot 1 (RLVMMP/WORKS/08LOT1), M/s RR Construction (Pvt). Ltd took over the sites on 16th March 2024.  The work consists of …