Site Possession – Package 05C

The selected contractor for landslide mitigation works in Package 05C (RLVMMP/WORKS/05C), M/s Sanguine – Sri Ram JV took over the sites on 17th October 2023. 

The work consists of constructions such as soil nailing, retaining walls, horizontal drains, reshaping & turfing, and surface drains, as slope rectification measures located in the following sites.

# Site No Site Name
1 034 St. Bernadette School
2 041 Walpola (Location 01)
3 047 Pallekanda, Delwita
4 061 Walpolakanda North Upper Colony
5 069 Dodamdeniya
6 094 Harasgama
7 095 Watagoda Hulangamuwa Road
8 096 Walpola (Location 02)

 

 

 

 

 

 

 

 

The Principal of St. Bernadette School, Grama Niladhari and the site beneficiaries of the respective locations were joined during this event.